ACHIEVEMENT AND EXPERIENCES

  • Petronas Vendor Development Program

    Kinsajasa is successfully appointed a Vendor under VDP program for "Provision of Condition Based Monitoring (CBM) Services (Mechanical) for Petronas and PSCs in East Malaysia Region (Sarawak)

    Petronas Vendor Development Program

    Petronas Vendor Development Program

  • Lube Oil Laboratory with Petronas SK-Oil

    Lube Oil Laboratory with Petronas SK-Oil

    Petronas SK-Oil has successfully setup its first and ever in-house lube oil laboratory at KJSB premise with the full support from KJSB. Started operation in April 2016, officially launched on 11 Oct 2016 by Mr M. Nazori Janor (BD/ HEAD SK-OIL)

    Lube Oil Laboratory with Petronas SK-Oil

  • Remediation of Lutong River Project – Sarawak Shell Berhad

    Remediation of Lutong River Project – Sarawak Shell Berhad

    Remediation of Lutong River Project – Sarawak Shell Berhad

    Remediation of Lutong River Project – Sarawak Shell Berhad

  • Machinery Lubrication Filtration Services for KBB (KPOC) - 2016

    As one of the company's milestone, Kinsajasa performed the first ever flushing services for Gas Turbine (Compressor/Generator) at KBB using the new Parker OFS500 together with FAM30. The kidney loop flushing service successfully reduced the particles and water content of the in-used oil to the acceptance level (ISO4406:99), thus prolonging the life of the oil and the reliability of the machines and also creating savings to client on lubricant consumption. Today, Kinsajasa has around 10 equipment's and the competencies to perform the services.

    Machinery Lubrication Filtration Services for KBB (KPOC) - 2016

  • IA and UA linework replacement at F23 and F6 with Lokring Technology (2007, 2008)

    Kinsajasa successfully carried out the full replacement and upgrade of the UA and IA linework from Carbon Steel to Stainless Steel using Lokring which require no hotwork. With the advantage of Lokring, the project managed to be completed in very short time frame, creating big saving to the client in terms of safety and production.

    IA and UA linework replacement at F23 and F6 with Lokring Technology (2007, 2008)

ACHIEVEMENT AND EXPERIENCES